Constitution Hall
The State of Michigan's new Constitution Hall in Lansing MI was the type of smooth flowing project that all communications and construction firms wish for. WTC worked with Christman Construction, Inc. in providing a quality communications installation, while fulfilling all contractual timelines flawlessly.
The Seven story, 2-tower building wasn't completely without challenges however. The installation process for the riser cable was complex, due to the connectivity provided for the two closets per tower, in addition to connecting the towers themselves. WTC provided the cable and installation for a State of Michigan designed 36 strand MM ringed system throughout the building.
On a per floor average there were 200, one voice/one data locations. All communications provided at workstation locations were complete and functioned at the highest standards possible upon the buildings opening.