Serving the State of Michigan for Over 30 Years

Hall of Justice

The beautifully designed, new State of Michigan Hall of Justice building began construction in October of 2001. WTC is once again working with Christman Construction INC. on the building, which is set for completion in October of 2002. The new construction building is a half moon shaped designed incredibly pleasing to the eye.

It is a seven-floor structure that contains two IDF's per floor. Its riser system contains 12mm/6sm fiber optic cable provided from the MDF to each IDF with an identical cable connecting each of the floors two IDF's together. The station cabling will be provided at over 1000 locations and will consist of 4 Giga speed wires at each location, combining for a total of approximately 800,000 ft of cable throughout the building.

The building will carry a 20-year Warranty on all Labor and Material that should last longer than any of the technologies involved with the voice and data networks.

''The beautifully designed, new State of Michigan Hall of Justice building began construction in October of 2001. The new construction building is a half moon shaped designed incredibly pleasing to the eye.
''It is a seven-floor structure that contains two IDF's per floor. Its riser system contains 12mm/6sm fiber optic cable provided from the MDF to each IDF with an identical cable connecting each of the floors two IDF's together. The station cabling will be provided at over 1000 locations and will consist of 4 Giga speed wires at each location, combining for a total of approximately 800,000 ft of cable throughout the building.